FAQ
Questions and answers
Plain-language answers about the project and its current stage.
The project
What stage is this project at?
NukeSystems is in concept development. The stated performance and dimensional figures are preliminary design targets, not measured results.
Is 25 MWe already demonstrated?
No. 25 MWe is the preliminary electrical output target for one proposed system.
Is an underground installation approved?
No. The underground arrangement is a design direction and would require engineering, licensing and site-specific review.
Has anything been built?
The images on this website are illustrative project scenes and interface previews. They are not evidence of manufactured or operating NukeSystems equipment. Please contact us for the current project status.
Who is behind NukeSystems?
NukeSystems™ is a project of Built to Unite Inc. See the Company page.
The system
What fits inside the modules?
The layout target is one reactor module and one module for energy conversion and electrical equipment, each with 40 ft high-cube external dimensions. Cooling and the site connection sit outside. Mass and shielding may change this.
How is remaining heat removed?
Through site cooling systems. Their type and size depend on the site and on the conversion technology, which is not yet selected.
Which turbine or power cycle will be used?
None has been selected. The site describes this step neutrally as energy conversion.
Do the data and digital twin systems control the reactor?
No. They are intended for monitoring, records, engineering review and maintenance planning. Reactor control and protection are separate, licensed systems.
Sites and delivery
What does a site require?
Assessment would cover the load, land, geology, cooling, electrical connection, transport access, security and approvals. No universal footprint is confirmed.
How would modules be delivered?
By heavy-haul road transport and, where useful, by sea as cargo. Configuration depends on final mass and applicable transport rules.
How would the system be maintained?
Monitoring, a digital model and robotic and drone inspection are being developed to support qualified maintenance staff. Procedures remain to be defined.
Cost, licensing and collaboration
What is the expected cost?
Not determined. We can discuss indicative figures and the assumptions behind them for a specific site.
Is the design licensed?
This website does not represent the design as licensed. The applicable approval pathway and confirmed milestones should be discussed with the project team.
How can we work together?
Through a site discussion, an engineering partnership or an investment inquiry. Use the contact form.