NUKESYSTEMS / ENERGY PLANNING WORKSHOP / 05
INTERACTIVE LOAD ARITHMETIC · NOT A DESIGN TOOLExplore how IT load, power usage effectiveness and average utilization shape the electricity a data center may require.
LOAD MODEL / 001
Changes happen in your browser. No customer inputs leave this page.
PUE = total facility power / IT equipment power. The assumed PUE is supplied for illustration; it is not a measured value or forecast.
ILLUSTRATIVE OUTPUT
Ceiling of the hypothetical facility peak divided by 25 MWe. This does not determine a viable reactor quantity, reserve margin, operating capacity or site design.
THREE CHECKS AFTER THE CALCULATOR
Maintenance, outages, grid connection, backup and contingency requirements are not represented in this calculator.
Neither server cooling nor power station heat rejection can be reduced to a single power number.
Physical system design, nuclear licensing, construction and cost must be assessed independently by qualified teams.
A transparent educational calculation using IT demand × PUE × average utilization × 8,760 hours per year. It does not predict nuclear output or validate NukeReactor.