NUKESYSTEMS / ENERGY PLANNING WORKSHOP / 05

INTERACTIVE LOAD ARITHMETIC · NOT A DESIGN TOOL

Put a number
on power demand.

Explore how IT load, power usage effectiveness and average utilization shape the electricity a data center may require.

LOAD MODEL / 001

Sketch the electrical demand.

Changes happen in your browser. No customer inputs leave this page.

Assumptions

5 MW100 MW
1.101.80
50%100%

PUE = total facility power / IT equipment power. The assumed PUE is supplied for illustration; it is not a measured value or forecast.

ILLUSTRATIVE OUTPUT

Facility peak electricity26.0 MW
Annual electricity demand193.6 GWh
IT equipment20 MW
Facility overhead6.0 MW
25 MWe nominal target — arithmetic comparison2 nominal units

Ceiling of the hypothetical facility peak divided by 25 MWe. This does not determine a viable reactor quantity, reserve margin, operating capacity or site design.

THREE CHECKS AFTER THE CALCULATOR

Arithmetic is the beginning.

01 / RELIABILITY

Firm capacity

Maintenance, outages, grid connection, backup and contingency requirements are not represented in this calculator.

02 / SITE THERMAL

Cooling interfaces

Neither server cooling nor power station heat rejection can be reduced to a single power number.

03 / ENGINEERING

Verify before sizing

Physical system design, nuclear licensing, construction and cost must be assessed independently by qualified teams.

What this tool is.

A transparent educational calculation using IT demand × PUE × average utilization × 8,760 hours per year. It does not predict nuclear output or validate NukeReactor.

Discuss engineering ↗